28/06/2022 - Europa Avenue Cycle Route – Approval to Phase 2 Works ref: 915 Recommendations Approved
Key issues resulting from the consultation and
the responses to them are:
The removal of several trees to widen the path; These will be
replaced at a ratio of two to one with new semi mature trees.
The improvement to the path along the Middleway will attract
anti-social behaviour; There is evidence that when a path is
improved and attracts more use it can decrease the incidents of
anti-social behaviour by increasing natural surveillance.
There will be conflicts between pedestrians and cyclists; The path
will be widened, and a demarcation line, tactile paving, logos,
signage and bollards will segregate pedestrians and cyclists. This
is a common arrange throughout the Country and fully accords with
the provisions of LTN/20. It represents an improvement on the
connecting shared pedestrian and cycle routes running through
Sandwell Valley
As can be seen, it is considered that the principle causes for
concern raised by respondents opposed to the scheme can be
mitigated through the design. Therefore, they are not considered to
be sufficiently serious as to warrant retaining the ‘on
carriageway’ route that currently exists when weighed against
the considerable improvements to the active travel provision in
this area that derive from implementing the off-carriageway route
through the Middleway.
Decision Maker: Cabinet Member for Environment and Highways
Decision published: 28/06/2022
Effective from: 28/06/2022
Decision:
That approval is given to construct phase 2 of
the proposed upgraded cycle route between Europa Avenue and
Sandwell Valley via Middleway Path.
Lead officer: John Swann